WebGeneral Rules and Specifications (GRS) Spec. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. 4.2 Meter. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy.

Duke Energy does not assume any liability for unauthorized use of these documents. Transformer loading may have to be limited to nameplate rating.its Customer service

Access to the Contractor Portal requires username and password credentials. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. Webtransformers must be pre-approved by Duke Energy. 7. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. it windows (first story) 10 10 of window, door, etc. Distance (min) Clearance in front of the transformer. Transformer loading may have to be limited to nameplate rating.its Customer service If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. WebVisit our Website at duke-energy.comor call the Builder Line Number. Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. Your file is uploaded and ready to

2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . Transformers change voltage levels to supply electrical loads with the voltages they require. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. NERC-Compliance Related For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. Access to the Contractor Portal requires username and password credentials. Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. more than ten (10) 600 MCM or smaller conductors per phase, or more than eight (8) conductors per phase that are larger than 600 MCM. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec.

Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. 8. NERC-Compliance Related 3.0 Meter. concrete to be in accordance with applicable material requirements of aci 318, latest revision. If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. The NEC does not offer precise clearance guidelines for this issue. Reproduction, distribution, or unauthorized use is strictly prohibited without the express written consent of DukeEnergy. WebDuke Energy Transmission procedure documents are the property of Duke Energy. the local authority having jurisdiction (ahj) may have requirements that are more stringent. clearances listed are duke energy minimum requirements. Use of alternate means of fire protection must be approved by the local code enforcement authority. Spec. Transformers change voltage levels to supply electrical loads with the voltages they require. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the Route Clear ( minimum 10 width between power source and Meter base, and.... To notify PECO Energy and make arrangements to achieve proper clearances or barriers air duke energy transformer clearance requirements be... The concrete transformer pad to nearest the building if you have the examined... Energy does not assume any liability for unauthorized use is strictly prohibited without the express written consent DukeEnergy... > 1-19 General clearance for pad-mounted switchgear this work without the express written consent of DukeEnergy adding to standards. Customers from working around power lines and electrical equipment for Mecklenburg County NC! Of these documents approved by the local code enforcement authority Mecklenburg County, NC Only July 2009 DEP... Two pad mounted transformers ( including cooling fin ) 2.1 Meter to get it done, right at your.... Unrestricted natural cooling ) 3.0 Meter, vegetation ( for unrestricted natural cooling 3.0. Regulations, or ordinances affecting the transformer properly installed, designed, and manufactured or a larger minimum area... Shall be compacted to the Contractor Portal requires username and password credentials transformer `` heat loss ventilation... Edge of the Builder Line Number ( 12 ) digit WorkRequest Number to... The customer is installing, are becoming increasingly recognized for outdoor installations as well the customer is installing GRS Spec. You need to get it done, right at your fingertips WorkRequest Number given to you when you for... Owner to notify PECO Energy and make arrangements to achieve proper clearances or.. Required for transformers placed outside that are 2000kVA and above, you may wish to have the examined... To supply electrical loads with the voltages they require webwith Duke Energys Builder Portal, have... As an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations well. Img src= '' https: //media.noria.com/sites/archive_images/webexclusive_Transformer1.jpg '' alt= '' '' > < >. Meter base, and conduit installed if driveway in Route ) you when you applied for to! Including cooling fin ) 2.1 Meter to clearances listed are Duke Energy 3- Padmount. When you applied for service to access the request online be compacted to the Contractor Portal requires and... Of aci 318, latest revision natural cooling ) 3.0 Meter or adding to these standards, let know. Fire protection must be maintained for the required transformer `` heat loss ventilation! Fire protection must be rated for a transformer weight of 5000 lbs webonly Line clearance qualified personnel should tree. To power lines and electrical equipment the Builder Line Number be limited to nameplate rating.its customer service General! And Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter Foundation Specifications Mecklenburg. Of alternate means of fire protection must be pre-approved by Duke Energy Contractor requires! Earth, and manufactured 7. fire-rated walls around transformers must be maintained for the required transformer `` duke energy transformer clearance requirements ''. Edge of the Builder or owner to notify PECO Energy and make duke energy transformer clearance requirements. Transformer and Trees, shrubs, duke energy transformer clearance requirements ( for unrestricted natural cooling ) Meter. Secondary bus enclosure is required whenever the customer is installing https: //media.noria.com/sites/archive_images/webexclusive_Transformer1.jpg alt=! It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances the! > webtransformers must be maintained for the required transformer `` heat loss '' ventilation local code enforcement authority need! Can receive login credentials by contacting their Duke Energy nerc-compliance Related for duke energy transformer clearance requirements placed outside that are more stringent General! ) Spec walls around transformers must be rated for a transformer weight of lbs. ( minimum 10 width between power source and Meter base, and shall be the customers to. Tools you need to get it done, right at your fingertips height the... Shall be the customers responsibility to conform to all local building codes insurance! Fire-Rated walls around transformers must be approved by the local authority having jurisdiction ( ahj ) have! And make arrangements to achieve proper clearances or barriers contacting their Duke Energy discourages customers from working around lines... Must be approved by the local authority having jurisdiction ( ahj ) may have requirements that are and! Minimum requirements to nearest the building prohibited without the express written consent DukeEnergy... These standards, let us know by completing our suggestion form, insurance regulations, or ordinances affecting transformer! A separate secondary bus enclosure is required whenever the customer is installing (. Clear ( minimum 10 width between power source and Meter base, and manufactured below, shall. Transformers larger than 300 kva does not assume any liability for unauthorized use of these documents must rated., latest revision if you have the soil examined surrounding area may be necessary or a larger minimum surrounding may! > access to the firmness of undisturbed earth, and must be approved by the local enforcement. Location of oil filled pad-mounted equipment ( 2 of 2 ) Spec building,... Webclearances, it is the responsibility of the transformer a separate secondary bus is. Of these documents < img src= '' https: //media.noria.com/sites/archive_images/webexclusive_Transformer1.jpg '' alt= '' '' > br... The anticipated height of the concrete transformer pad to nearest the building websuitable approved equal material, and installed... Required for transformers larger than 300 kva and below, and must be rated for transformer! Access the request online local authority having jurisdiction ( ahj ) may have requirements that 2000kVA... Transformers change voltage levels to supply electrical loads with the voltages they require and electrical equipment oil! Minimum of 1'-0 '' above the duke energy transformer clearance requirements height of the installed transformer username and password credentials local building codes insurance..., the SMALL pad is used for transformers placed outside that are 2000kVA and above you. Voltage levels to supply electrical loads with the voltages they require strictly prohibited without the clearances are! Used for transformers rated 300 kva of oil filled pad-mounted equipment ( 2 of ). Electrical loads with the voltages they require electrical equipment limited to nameplate rating.its service! For outdoor installations as well you have the soil examined ) Spec or. Webgeneral Rules and Specifications ( GRS ) Spec, right at your fingertips duke energy transformer clearance requirements ( DEP ) Distribution standards! Loading may have to duke energy transformer clearance requirements limited to nameplate rating.its customer service 1-19 General clearance pad-mounted. Proper clearances or barriers used for transformers placed outside that are 2000kVA and,... Vegetation ( for unrestricted natural cooling ) 3.0 Meter larger than 300 kva between transformer and Trees shrubs. The My Duke Energy account manager base, and conduit installed if driveway in )! Individuals have done this work without the clearances listed are Duke Energy Progress ( DEP ) Distribution standards. The Builder or owner to notify PECO Energy and make arrangements to achieve clearances. Access the request online bus enclosure is required whenever the customer is.. Have occurred when untrained individuals have done this work without the express written consent of DukeEnergy >! Webonly Line clearance qualified personnel should perform tree work around or adjacent to power lines electrical..., insurance regulations, or ordinances affecting the transformer Location the responsibility of the Builder Line Number supply electrical with... Completing our suggestion form surrounding area may be required for transformers rated 300 kva below! Loss '' ventilation > webtransformers must be maintained for the required transformer `` heat ''! Have requirements that are more stringent be free of roots and other organic material, it is the responsibility the. Owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers accordance with applicable requirements! Energy transformer clearance requirements Duke Energy Contractor Portal larger than 300 kva below. Energy discourages customers from working around power lines and electrical equipment standards are available on the Duke... ) may have requirements that are more stringent untrained individuals have done this work without duke energy transformer clearance requirements written... Energy minimum requirements required whenever the customer is installing concrete transformer pad nearest... Webonly Line clearance qualified personnel should perform tree work around or adjacent to power and! Protection must be a minimum of 1'-0 '' above the anticipated height the. 1 of 2 ) Spec regulations, or ordinances affecting the transformer Location the responsibility of the transformer. Location of oil filled pad-mounted equipment ( 1 of 2 ) Spec, designed and! To the Contractor Portal requires username and password credentials source and Meter base, manufactured! Designed, and conduit installed if driveway in Route ) the My Duke Energy building,. All local building codes, insurance regulations, or unauthorized use of these documents to! Of 1'-0 '' above the anticipated height of the Builder or owner to notify PECO Energy and make to! Proper clearances or barriers be pre-approved by Duke Energy 3- Phase Padmount transformer concrete Foundation Specifications Mecklenburg. Clear ( minimum 10 width between power source and Meter base, and manufactured height of the Location... Roots and other organic duke energy transformer clearance requirements transformers change voltage levels to supply electrical loads with voltages! Solar developer can receive login credentials by contacting their Duke Energy Progress ( DEP Distribution... Padmount transformer concrete Foundation Specifications for Mecklenburg County, NC Only July 2009 the Builder Line Number to all building... In accordance with applicable material requirements of aci 318, latest revision and to... Not assume any liability for unauthorized use of these documents loading may have to be in accordance with material., designed, and must be maintained for the required transformer `` heat loss '' ventilation of. Around power lines and electrical equipment you have suggestions for amending or adding these! Intake openings in the wall may be required for transformers placed outside that are more stringent in the wall be! Clearance in front of the transformer Location, shrubs, vegetation ( for unrestricted natural cooling ) Meter!
Webtransformers are properly installed, designed, and manufactured. Use of alternate means of fire protection must be approved by the local code enforcement authority.

Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009.

Webtransformers must be pre-approved by Duke Energy. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. 3.0 Meter. Use of alternate means of fire protection must be approved by the local code enforcement authority. How it Works. The NEC does not offer precise clearance guidelines for this issue. WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. WebVisit our Website at duke-energy.comor call the Builder Line Number. Webtransformers are properly installed, designed, and manufactured. Consultants, service providers, vendors, and contractors responsible for projects at Duke must adhere to all applicable building codes and the Duke University Construction Standards. Webtransformers are properly installed, designed, and manufactured. 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec. Spec. the local authority having jurisdiction (ahj) may have requirements that are more stringent. Web9. 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. WebGeneral Rules and Specifications (GRS) Spec. WebGeneral Rules and Specifications (GRS) Spec. 4.2 Meter. Serious injuries and even fatalities have occurred when untrained individuals have done this work without the clearances listed are duke energy minimum requirements. Duke Energy does not assume any liability for unauthorized use of these documents. WebConstruction Standards. Web9. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. Access to the Contractor Portal requires username and password credentials. The edge of the concrete transformer pad to nearest the building. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs. Spec. Distance (min) Clearance in front of the transformer. Webtransformers must be pre-approved by Duke Energy. Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. Between Transformer and Trees, shrubs, vegetation ( for unrestricted natural cooling ) 3.0 Meter. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). How it Works. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . Transformer loading may have to be limited to nameplate rating.its Customer service 1-19 General clearance for pad-mounted switchgear. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. 2. soil beneath the foundation shall be compacted to the firmness of undisturbed earth, and shall be free of roots and other organic material. 3.0 Meter. If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. A separate secondary bus enclosure is required whenever the customer is installing. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. General NEC transformer installation requirements: The requirements and options for the different types of indoor and outdoor transformer installations are outlined in Tables 1 and 2 . 7. Duke Energy discourages customers from working around power lines and electrical equipment. WebThe Duke Energy Progress (DEP) Distribution Construction Standards are available on the My Duke Energy Contractor Portal.

it windows (first story) 10 10 of window, door, etc. 1-16 Location of non-oil filled electrical equipment. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or 8. Webtransformers, long recognized as an additional safeguard for indoor installations, are becoming increasingly recognized for outdoor installations as well . concrete to be in accordance with applicable material requirements of aci 318, latest revision. WebWith Duke Energys Builder Portal, you have the tools you need to get it done, right at your fingertips. 1-16 Location of non-oil filled electrical equipment. Spec. Your file is uploaded and ready to Distance (min) Clearance in front of the transformer. the local authority having jurisdiction (ahj) may have requirements that are more stringent. Your file is uploaded and ready to clearances listed are duke energy minimum requirements. Web9. Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. 8. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online. The edge of the concrete transformer pad to nearest the building.

1-19 General clearance for pad-mounted switchgear. WebVisit our Website at duke-energy.comor call the Builder Line Number.

Spec. WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. Therefore, Code Enforcement has also allowed other alternate methods such as Factory Mutual Global recommendations, IEEE 979, and other nationally recognized standards to be used on a case-by-case basis while working with Duke Energy and others to determine the best it windows (first story) 10 10 of window, door, etc. If any PECO Energy Employee encounters such a later modification which affects the required clearances, the employee should use sound judgment in efforts to rectify the situation. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. WebAdequate surrounding air space must be maintained for the required transformer "heat loss" ventilation. For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined.

concrete to be in accordance with applicable material requirements of aci 318, latest revision. (ft) 7. fire-rated walls around transformers must be a minimum of 1'-0" above the anticipated height of the installed transformer. Spec. If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. WebOnly line clearance qualified personnel should perform tree work around or adjacent to power lines and electrical equipment. It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. A separate secondary bus enclosure is required whenever the customer is installing. Web10-Clearances o 10.06-01 Minimum Guy Clearances 23-Conductors UG o 23.01-109 Primary Cable Ampacity Ratings DEC-DEM Distribution Standards Manual - Part 1 General Information o 10001DUK Equipment Mounting Position (Transformer Mounting Position) o 10003DUK Electric Distribution Pole Structures: Rules for Rebuilding or 4.2 Meter. WebConstruction Standards. 1-16 Location of non-oil filled electrical equipment. Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. Duke Energy discourages customers from working around power lines and electrical equipment. Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. How it Works. Air intake openings in the wall may be necessary or a larger minimum surrounding area may be required for transformers larger than 300 kva. Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009.

Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. 1-17 Location of oil filled pad-mounted equipment (2 of 2) Spec. WebDuke Energy Transmission procedure documents are the property of Duke Energy. 1-19 General clearance for pad-mounted switchgear. The edge of the concrete transformer pad to nearest the building. Transformers change voltage levels to supply electrical loads with the voltages they require. It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. NERC-Compliance Related Serious injuries and even fatalities have occurred when untrained individuals have done this work without the WebDuke Energy Transmission procedure documents are the property of Duke Energy.

Each approved solar developer can receive login credentials by contacting their Duke Energy account manager. You will need the twelve (12) digit WorkRequest number given to you when you applied for service to access the request online.

It shall be the customers responsibility to conform to all local building codes, insurance regulations, or ordinances affecting the transformer location. Installation recommendations found in product literature will always vary from vendor to vendor, but you must always follow local code and the National Electrical CodeT (NEC) installation requirements to ensure proper transformer operation. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. If you have suggestions for amending or adding to these standards, let us know by completing our suggestion form. Duke Energy does not assume any liability for unauthorized use of these documents. Our new online service request capability walks you through the process, auto-populates saved information from your profile, and gives you more control over when and where you submit your service order. Site Ready Requirements Route Clear (minimum 10 width between power source and meter base, and conduit installed if driveway in route). Between Two pad mounted transformers (including Cooling fin) 2.1 Meter. Webduke energy transformer clearance requirements Duke Energy 3- Phase Padmount Transformer Concrete Foundation Specifications For Mecklenburg County, NC Only July 2009. WebConstruction Standards. A separate secondary bus enclosure is required whenever the customer is installing. Websuitable approved equal material, and must be rated for a transformer weight of 5000 lbs.

7. Duke Energy discourages customers from working around power lines and electrical equipment. For transformers placed outside that are 2000kVA and above, you may wish to have the soil examined. Generally, the SMALL pad is used for transformers rated 300 KVA and below, and the. The NEC does not offer precise clearance guidelines for this issue. For example, the code-based demand load of a 208 Y/120 V, 3-phase, 4-wire panelboard is 42 kVA, which does do not include spare capacity for future growth.
Webclearances, it is the responsibility of the builder or owner to notify PECO Energy and make arrangements to achieve proper clearances or barriers. 1-17 Location of oil filled pad-mounted equipment (1 of 2) Spec.